W60 - S71 CONN OC over GAREY AVE
07-LA-060-R29.38-POM · County 037, California · Built 1996 · 2 Lanes · 236,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.023481, -117.747947
This bridge is in worse condition than 15.3% of bridges in County 037. The average bridge in California is 0 years old; this one is 30 years old.
Nearby Bridges
STATE ROUTE 60 WB over GAREY AVE
Built 1970
STATE ROUTE 60 EB over GAREY AVE
Built 1970
N71-W60 CONNECTOR over ST RTE 71 ST RTE 60 RAMP
Built 1997
S71-E60 CONNECTOR over W60-S71 CONNECTOR RAMP
Built 1997
STATE ROUTE 71 SB over STATE ROUTE 60 & RAMPS
Built 1997
W60 - N71 CONN over GAREY AVE
Built 1996
N71-RIO RANCHO OFF over W60 - N71 CONNECTOR RAMP
Built 1997
S71-E60 CONNECTOR over ST RTE 71 ST RTE 60 RMPS
Built 1997
E60-S71 CONN OC over PEYTON DR OFF-RAMP
Built 1993
STATE ROUTE 71 NB over STATE ROUTE 60 & RAMPS
Built 1997
Bridge Details
- Structure #
- 53 2744F
- Year Built
- 1996
- Length
- 53.8 m (176.5 ft)
- Max Span
- 28.5 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 236,000
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.