W60 - N71 CONN over GAREY AVE

07-LA-060-R29.38-POM · County 037, California · Built 1996 · 2 Lanes · 236,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 2741F
Year Built
1996
Length
53.8 m (176.5 ft)
Max Span
28.5 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
236,000
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.