S71-E60 CONNECTOR over W60-S71 CONNECTOR RAMP
07-LA-071-R4.05-POM · County 037, California · Built 1997 · 3 Lanes · 14,100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
34.023383, -117.749217
This bridge is in worse condition than 15.3% of bridges in County 037. The average bridge in California is 0 years old; this one is 29 years old.
Nearby Bridges
N71-W60 CONNECTOR over ST RTE 71 ST RTE 60 RAMP
Built 1997
STATE ROUTE 60 WB over GAREY AVE
Built 1970
N71-RIO RANCHO OFF over W60 - N71 CONNECTOR RAMP
Built 1997
W60 - S71 CONN OC over GAREY AVE
Built 1996
STATE ROUTE 60 EB over GAREY AVE
Built 1970
S71-E60 CONNECTOR over ST RTE 71 ST RTE 60 RMPS
Built 1997
STATE ROUTE 71 SB over STATE ROUTE 60 & RAMPS
Built 1997
W60 - N71 CONN over GAREY AVE
Built 1996
STATE ROUTE 71 NB over STATE ROUTE 60 & RAMPS
Built 1997
E60-S71 CONN OC over PEYTON DR OFF-RAMP
Built 1993
Bridge Details
- Structure #
- 53 2746G
- Year Built
- 1997
- Length
- 44.5 m (146 ft)
- Max Span
- 44.5 m
- Width
- 16 m (52.5 ft)
- Lanes
- 3
- Daily Traffic
- 14,100
- Material
- Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.