PRAIRIE AVE over ROUTE 105 & LRT

07-LA-105-R3.62-HAW · County 037, California · Built 1993 · 6 Lanes · 35,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
53 2517
Year Built
1993
Length
143.2 m (469.8 ft)
Max Span
38.2 m
Width
29.9 m (98.1 ft)
Lanes
6
Daily Traffic
35,700
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.