ROUTE 105 & LRT over DOMINGUEZ CHANNEL

07-LA-105-R4.16-ING · County 037, California · Built 1993 · 10 Lanes · 107,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 2518
Year Built
1993
Length
50.9 m (167 ft)
Max Span
50.9 m
Width
62.8 m (206 ft)
Lanes
10
Daily Traffic
107,100
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.