RTE 105 RAMPS over DOMINGUEZ CHANNEL

07-LA-105-R4.59-HAW · County 037, California · Built 1988 · 5 Lanes · 18,054 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
53 2531M
Year Built
1988
Length
18.6 m (61 ft)
Max Span
4.4 m
Width
26.8 m (87.9 ft)
Lanes
5
Daily Traffic
18,054
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.