ROUTE 105 & LRT over INGLEWOOD AVE

07-LA-105-R2.53-HAW · County 037, California · Built 1993 · 8 Lanes · 118,550 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 2435
Year Built
1993
Length
45.4 m (149 ft)
Max Span
45.4 m
Width
54.3 m (178.1 ft)
Lanes
8
Daily Traffic
118,550
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.