KANSAS AVENUE over FUTURE CA HIGHSPEED RAIL

WEST OF STATE ROUTE 43 · County 031, California · Built 2022 · 2 Lanes · 1,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
45C0151
Year Built
2022
Length
63.1 m (207 ft)
Max Span
27.1 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
1,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.