JACKSON AVE over CROSS CREEK

0.9 MI W OF 5TH AVE · County 031, California · Built 1975 · 2 Lanes · 450 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
45C0112
Year Built
1975
Length
28.3 m (92.8 ft)
Max Span
11 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
450
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.