IDAHO AVE over FUTURE CA HIGHSPEED RAIL

E OF RTE 43 E OF 8TH AVE · County 031, California · Built 2022 · 2 Lanes · 2,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
45C0149
Year Built
2022
Length
62.5 m (205.1 ft)
Max Span
27.1 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
2,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.