6TH AVE over E BRANCH LAKELAND CANAL

3.3 MI S OF KANSAS AVE · County 031, California · Built 1986 · 2 Lanes · 400 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
45C0081
Year Built
1986
Length
32.9 m (107.9 ft)
Max Span
7.9 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
400
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$286,000
Total Project Cost
$480,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.