INTERSTATE 580 over CANAL BOULEVARD

04-CC-580-R4.64-RCH · County 013, California · Built 1991 · 7 Lanes · 55,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
28 0278
Year Built
1991
Length
64.2 m (210.6 ft)
Max Span
32.1 m
Width
45.9 m (150.6 ft)
Lanes
7
Daily Traffic
55,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.