I 580 WB over CASTRO STREET

04-CC-580-R5.11-RCH · County 013, California · Built 1990 · 3 Lanes · 27,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
28 0290R
Year Built
1990
Length
86.3 m (283.1 ft)
Max Span
31.4 m
Width
16.6 m (54.5 ft)
Lanes
3
Daily Traffic
27,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,428,000
Total Project Cost
$2,399,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.