CANAL BL-W580 ONRP over BNSF RY & GARRARD BLVD
04-CC-580-R4.81-RCH · County 013, California · Built 1980 · 2 Lanes · 2,450 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
37.927986, -122.381147
This bridge is in worse condition than 91.3% of bridges in County 013. The average bridge in California is 0 years old; this one is 46 years old.
Nearby Bridges
I 580 WB over BNSF RY & GARRARD BLVD
Built 1991
I 580 EB over BNSF RY & GARRARD BLVD
Built 1980
EB ONRAMP over BNSF RY & GARRARD BLVD
Built 1980
I 580 EB OFF RAMP over BNSF RY & GARRARD BLVD
Built 1991
INTERSTATE 580 over CANAL BOULEVARD
Built 1991
CANAL&CASTRO-W580 over CASTRO STREET
Built 1990
I 580 WB over CASTRO STREET
Built 1990
I 580 EB over CASTRO STREET
Built 1988
I 580 over MARINE STREET
Built 1990
CASTRO STREET over CHEVRON RAILROAD TRACKS
Built 1995
Bridge Details
- Structure #
- 28 0056S
- Year Built
- 1980
- Reconstructed
- 1991
- Length
- 276.1 m (905.8 ft)
- Max Span
- 45.7 m
- Width
- 12 m (39.4 ft)
- Lanes
- 2
- Daily Traffic
- 2,450
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,420,000
- Total Project Cost
- $5,745,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.