INTERSTATE 580 over BNSF RY SOUTH SECOND ST
04-CC-580-R4.09-RCH · County 013, California · Built 1990 · 8 Lanes · 69,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
37.927092, -122.369158
This bridge is in worse condition than 91.3% of bridges in County 013. The average bridge in California is 0 years old; this one is 36 years old.
Nearby Bridges
CUTTING BLVD over INTERSTATE 580
Built 1989
INTERSTATE 580 over CANAL BOULEVARD
Built 1991
HARBOUR WAY over INTERSTATE 580
Built 1989
I 580 EB OFF RAMP over BNSF RY & GARRARD BLVD
Built 1991
CANAL BL-W580 ONRP over BNSF RY & GARRARD BLVD
Built 1980
I 580 WB over BNSF RY & GARRARD BLVD
Built 1991
I 580 EB over BNSF RY & GARRARD BLVD
Built 1980
EB ONRAMP over BNSF RY & GARRARD BLVD
Built 1980
MARINA WAY OC over INTERSTATE 580
Built 1989
CASTRO STREET over CHEVRON RAILROAD TRACKS
Built 1995
Bridge Details
- Structure #
- 28 0277
- Year Built
- 1990
- Length
- 174.8 m (573.5 ft)
- Max Span
- 35.4 m
- Width
- 45.1 m (148 ft)
- Lanes
- 8
- Daily Traffic
- 69,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.