MARINA WAY OC over INTERSTATE 580
04-CC-580-R3.35-RCH · County 013, California · Built 1989 · 4 Lanes · 4,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.922106, -122.355917
This bridge is in worse condition than 12.2% of bridges in County 013. The average bridge in California is 0 years old; this one is 37 years old.
Nearby Bridges
HARBOUR WAY over INTERSTATE 580
Built 1989
CUTTING BLVD over INTERSTATE 580
Built 1989
SOUTH 23RD ST over INTERSTATE 580
Built 1987
INTERSTATE 580 over BNSF RY SOUTH SECOND ST
Built 1990
ERLANDSON ST over INTERSTATE ROUTE 580
Built 1988
INTERSTATE 580 over CANAL BOULEVARD
Built 1991
I 580 EB OFF RAMP over BNSF RY & GARRARD BLVD
Built 1991
CANAL BL-W580 ONRP over BNSF RY & GARRARD BLVD
Built 1980
I 580 WB over BNSF RY & GARRARD BLVD
Built 1991
I 580 EB over BNSF RY & GARRARD BLVD
Built 1980
Bridge Details
- Structure #
- 28 0274
- Year Built
- 1989
- Length
- 74.1 m (243.1 ft)
- Max Span
- 37.5 m
- Width
- 23.2 m (76.1 ft)
- Lanes
- 4
- Daily Traffic
- 4,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.