INTERSTATE 680 over E MARTINEZ DRAIN
04-CC-680-22.27 · County 013, California · Built 1962 · 8 Lanes · 118,000 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
38.006167, -122.083439
This bridge is in worse condition than 12.2% of bridges in County 013. The average bridge in California is 0 years old; this one is 64 years old.
Nearby Bridges
N680-PACHECO OFFRP over INTERSTATE ROUTE 680
Built 1962
PACHECO BLVD over E MARTINEZ DRAIN
Built 1962
INTERSTATE 680 over ARTHUR ROAD
Built 1962
INTERSTATE 680 over BLUM ROAD
Built 1962
SB 680-WB 4 CONN over BLUM ROAD
Built 2005
IMHOFF ROAD over CENTRAL SANITARY RD
Built 1975
STATE ROUTE 4 over PACHECO BLVD
Built 1962
MILANO WAY over STATE ROUTE 4
Built 1975
STATE ROUTE 4 over INTERSTATE ROUTE 680
Built 1962
STATE ROUTE 4 over GRAYSON CREEK
Built 2021
Bridge Details
- Structure #
- 28 0219
- Year Built
- 1962
- Length
- 7.3 m (24 ft)
- Max Span
- 3 m
- Lanes
- 8
- Daily Traffic
- 118,000
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.