N680-PACHECO OFFRP over INTERSTATE ROUTE 680
04-CC-680-22.43 · County 013, California · Built 1962 · 2 Lanes · 7,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.007836, -122.084983
This bridge is in worse condition than 91.3% of bridges in County 013. The average bridge in California is 0 years old; this one is 64 years old.
Nearby Bridges
INTERSTATE 680 over E MARTINEZ DRAIN
Built 1962
PACHECO BLVD over E MARTINEZ DRAIN
Built 1962
INTERSTATE 680 over ARTHUR ROAD
Built 1962
INTERSTATE 680 over BLUM ROAD
Built 1962
SB 680-WB 4 CONN over BLUM ROAD
Built 2005
IMHOFF ROAD over CENTRAL SANITARY RD
Built 1975
MILANO WAY over STATE ROUTE 4
Built 1975
STATE ROUTE 4 over PACHECO BLVD
Built 1962
STATE ROUTE 4 over INTERSTATE ROUTE 680
Built 1962
STATE ROUTE 4 over GRAYSON CREEK
Built 2021
Bridge Details
- Structure #
- 28 0169S
- Year Built
- 1962
- Length
- 67.7 m (222.1 ft)
- Max Span
- 36.9 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 7,000
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $684,000
- Total Project Cost
- $1,149,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.