STATE ROUTE 4 over PACHECO BLVD
04-CC-004-12.41 · County 013, California · Built 1962 · 8 Lanes · 82,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
37.992922, -122.074133
This bridge is in worse condition than 46.8% of bridges in County 013. The average bridge in California is 0 years old; this one is 64 years old.
Nearby Bridges
STATE ROUTE 4 over INTERSTATE ROUTE 680
Built 1962
SB 680-WB 4 CONN over BLUM ROAD
Built 2005
INTERSTATE 680 over BLUM ROAD
Built 1962
INTERSTATE 680 over GRAYSON CREEK
Built 1962
EB 4-SB 680 CONN over GRAYSON CREEK
Built 2005
STATE ROUTE 4 over GRAYSON CREEK
Built 2021
PACHECO BLVD over GRAYSON CREEK
Built 1975
IMHOFF ROAD over CENTRAL SANITARY RD
Built 1975
IMHOFF ROAD over GRAYSON CREEK
Built 1981
MILANO WAY over STATE ROUTE 4
Built 1975
Bridge Details
- Structure #
- 28 0182
- Year Built
- 1962
- Reconstructed
- 2021
- Length
- 44.3 m (145.3 ft)
- Max Span
- 21.6 m
- Width
- 43.4 m (142.4 ft)
- Lanes
- 8
- Daily Traffic
- 82,600
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.