MILANO WAY over STATE ROUTE 4
04-CC-004-R11.13-MTZ · County 013, California · Built 1975 · 2 Lanes · 5,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
37.990972, -122.0868
This bridge is in worse condition than 46.8% of bridges in County 013. The average bridge in California is 0 years old; this one is 51 years old.
Nearby Bridges
STATE ROUTE 4 over PACHECO BLVD
Built 1962
STATE ROUTE 4 WB over MORELLO AVE
Built 1975
STATE ROUTE 4 EB over MORELLO AVE
Built 1975
SB 680-WB 4 CONN over BLUM ROAD
Built 2005
INTERSTATE 680 over BLUM ROAD
Built 1962
STATE ROUTE 4 over INTERSTATE ROUTE 680
Built 1962
PACHECO BLVD over GRAYSON CREEK
Built 1975
CHRISTEN DR over CONTRA COSTA CANAL
Built 1990
EB 4-SB 680 CONN over GRAYSON CREEK
Built 2005
INTERSTATE 680 over GRAYSON CREEK
Built 1962
Bridge Details
- Structure #
- 28 0217
- Year Built
- 1975
- Length
- 94.8 m (311 ft)
- Max Span
- 48.5 m
- Width
- 15.8 m (51.8 ft)
- Lanes
- 2
- Daily Traffic
- 5,500
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.