EB 4-SB 680 CONN over GRAYSON CREEK
04-CC-680-20.88 · County 013, California · Built 2005 · 1 Lanes · 28,700 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
37.990239, -122.067792
This bridge is in worse condition than 91.3% of bridges in County 013. The average bridge in California is 0 years old; this one is 21 years old.
Nearby Bridges
INTERSTATE 680 over GRAYSON CREEK
Built 1962
PACHECO BLVD over GRAYSON CREEK
Built 1975
STATE ROUTE 4 over INTERSTATE ROUTE 680
Built 1962
STATE ROUTE 4 over GRAYSON CREEK
Built 2021
STATE ROUTE 4 over PACHECO BLVD
Built 1962
IMHOFF ROAD over GRAYSON CREEK
Built 1981
CENTER AVENUE over GRAYSON CREEK
Built 1970
INTERSTATE 680 over CENTER AVE
Built 1962
SECOND AVE SOUTH over GRAYSON CREEK
Built 1954
SB 680-WB 4 CONN over BLUM ROAD
Built 2005
Bridge Details
- Structure #
- 28 0180K
- Year Built
- 2005
- Length
- 104.8 m (343.8 ft)
- Max Span
- 13.9 m
- Width
- 9 m (29.5 ft)
- Lanes
- 1
- Daily Traffic
- 28,700
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $943,000
- Total Project Cost
- $1,584,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.