SECOND AVE SOUTH over GRAYSON CREEK
JUST W CONTRA COSTA BLVD · County 013, California · Built 1954 · 2 Lanes · 3,419 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 7 | Good |
Location
37.98175, -122.069103
This bridge is in worse condition than 91.3% of bridges in County 013. The average bridge in California is 0 years old; this one is 72 years old.
Nearby Bridges
CENTER AVENUE over GRAYSON CREEK
Built 1970
INTERSTATE 680 over CENTER AVE
Built 1962
PACHECO BLVD over GRAYSON CREEK
Built 1975
CHRISTEN DR over CONTRA COSTA CANAL
Built 1990
CHILPACINGO PARKWY over GRAYSON CREEK
Built 1969
INTERSTATE 680 over CONCORD AVE
Built 1962
EB 4-SB 680 CONN over GRAYSON CREEK
Built 2005
COTTONWOOD DRIVE over GRAYSON CREEK
Built 1970
INTERSTATE 680 over GRAYSON CREEK
Built 1962
GOLF CLUB ROAD over GRAYSON CREEK
Built 2014
Bridge Details
- Structure #
- 28C0383
- Year Built
- 1954
- Length
- 31 m (101.7 ft)
- Max Span
- 6.7 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 3,419
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $740,000
- Total Project Cost
- $1,244,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.