U.S. ROUTE 101 over FUTURE RAINIER AVENUE

04-SON-101-5.58-PET · County 097, California · Built 2022 · 6 Lanes · 103,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
20 0301
Year Built
2022
Length
51.2 m (168 ft)
Max Span
26.1 m
Width
36.2 m (118.8 ft)
Lanes
6
Daily Traffic
103,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.