PAYRAN ST over PETALUMA RIVER

0.3 MI E/O PETALUMA BL · County 097, California · Built 1997 · 2 Lanes · 7,575 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
20C0509
Year Built
1997
Length
47.9 m (157.2 ft)
Max Span
18.3 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
7,575
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.