U.S. ROUTE 101 SB over SMART RAILROAD TRACKS

04-SON-101-5.73-PET · County 097, California · Built 2022 · 3 Lanes · 51,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
20 0300L
Year Built
2022
Length
107.2 m (351.7 ft)
Max Span
41.1 m
Width
18.1 m (59.4 ft)
Lanes
3
Daily Traffic
51,500
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.