U.S. ROUTE 101 NB over SMART RAILROAD TRACKS

04-SON-101-5.74-PET · County 097, California · Built 2022 · 3 Lanes · 51,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
20 0300R
Year Built
2022
Length
111.6 m (366.1 ft)
Max Span
43.9 m
Width
18.1 m (59.4 ft)
Lanes
3
Daily Traffic
51,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Park, Forest, or Reservation Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.