Happy Valley Rd over I-17
.9 mi E.of Pinnacle Rd. · County 013, Arizona · Built 2020 · 4 Lanes · 20,009 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.7129, -112.1179
This bridge is in worse condition than 48% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 6 years old.
Nearby Bridges
Happy Valley Road over Dry Wash
Built 2002
Happy Valley Road over Skunk Creek
Built 2004
Happy Valley Road over Skunk Creek
Built 2005
Farmers Way over Drainage Channel
Built 2007
Questa Drive over Dry Wash
Built 2007
I-17 over Scatter Wash North
Built 2009
Jomax Rd EB over I-17
Built 2009
Pinnacle Peak Rd over I-17
Built 2018
W Pinnacle Peak Rd over Scatter Wash E Channel
Built 2018
I-17 over Scatter Wash South
Built 2009
Bridge Details
- Structure #
- 20161
- Year Built
- 2020
- Length
- 79.6 m (261.2 ft)
- Max Span
- 39.3 m
- Width
- 18.3 m (60 ft)
- Lanes
- 4
- Daily Traffic
- 20,009
- Material
- Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.