Pinnacle Peak Rd over I-17
6.9 mi S. of Jct SR 74 · County 013, Arizona · Built 2018 · 8 Lanes · 17,037 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.6997, -112.1151
This bridge is in worse condition than 48% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 8 years old.
Nearby Bridges
W Pinnacle Peak Rd over Scatter Wash E Channel
Built 2018
Questa Drive over Dry Wash
Built 2007
I-17 over Scatter Wash South
Built 2009
I-17 over Scatter Wash North
Built 2009
Farmers Way over Drainage Channel
Built 2007
19th Avenue over Scatter Wash
Built 2006
Happy Valley Rd over I-17
Built 2020
Happy Valley Road over Dry Wash
Built 2002
I-17 over Deer Valley Road
Built 2009
Happy Valley Road over Skunk Creek
Built 2005
Bridge Details
- Structure #
- 20112
- Year Built
- 2018
- Length
- 79.6 m (261.2 ft)
- Max Span
- 39.3 m
- Width
- 38.1 m (125 ft)
- Lanes
- 8
- Daily Traffic
- 17,037
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.