Pinnacle Peak Rd over I-17

6.9 mi S. of Jct SR 74 · County 013, Arizona · Built 2018 · 8 Lanes · 17,037 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
20112
Year Built
2018
Length
79.6 m (261.2 ft)
Max Span
39.3 m
Width
38.1 m (125 ft)
Lanes
8
Daily Traffic
17,037
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.