Happy Valley Road over Dry Wash
at 23rd Ave Intersection · County 013, Arizona · Built 2002 · 7 Lanes · 21,160 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.7129, -112.1088
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 24 years old.
Nearby Bridges
Farmers Way over Drainage Channel
Built 2007
Happy Valley Rd over I-17
Built 2020
Questa Drive over Dry Wash
Built 2007
W Pinnacle Peak Rd over Scatter Wash E Channel
Built 2018
Pinnacle Peak Rd over I-17
Built 2018
I-17 over Scatter Wash North
Built 2009
Happy Valley Road over Skunk Creek
Built 2004
Happy Valley Road over Skunk Creek
Built 2005
Jomax Rd EB over I-17
Built 2009
North Valley Pkwy over CAP Canal
Built 2011
Bridge Details
- Structure #
- 11652
- Year Built
- 2002
- Length
- 7 m (23 ft)
- Max Span
- 3 m
- Width
- 34.1 m (111.9 ft)
- Lanes
- 7
- Daily Traffic
- 21,160
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.