SB 59th Ave over RID Canal

2.3 mi S. I-10/ SMF TI · County 013, Arizona · Built 2019 · 2 Lanes · 120 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
20145
Year Built
2019
Length
11 m (36.1 ft)
Max Span
9.8 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
120
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.