SR202L S Mntn Fwy over Lower Buckeye Rd
2.8 mi S. I-10/ SMF TI · County 013, Arizona · Built 2019 · 8 Lanes · 68,603 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.4224, -112.1899
This bridge is in worse condition than 48% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 7 years old.
Nearby Bridges
SR202L S Mntn Fwy over RID Cnl/Durango Rd
Built 2019
SB 59th Ave over RID Canal
Built 2019
L202 over RID Canal
Built 1980
Buckeye Rd Ramp B over Durango Channel
Built 2019
WB 202L S.Mountain over Broadway Rd
Built 2019
SR202L S Mntn Fwy over Buckeye Rd
Built 2019
EB 202L S.Mountain over Broadway Rd
Built 2019
51st Avenue over RID Canal
Built 2006
SR202L EB and WB over UPRR Railroad
Built 2019
NB Frontage Rd over UPRR Railroad
Built 2019
Bridge Details
- Structure #
- 20143
- Year Built
- 2019
- Length
- 42.4 m (139.1 ft)
- Max Span
- 40.8 m
- Width
- 44.2 m (145 ft)
- Lanes
- 8
- Daily Traffic
- 68,603
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.