SB Frontage Rd over UPRR Railroad
1.3 mi S Jct I-10 · County 013, Arizona · Built 2018 · 2 Lanes · 2,430 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.4441, -112.1874
This bridge is in worse condition than 48% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 8 years old.
Nearby Bridges
SR202L EB and WB over UPRR Railroad
Built 2019
NB Frontage Rd over UPRR Railroad
Built 2019
SR202L S Mntn Fwy over Buckeye Rd
Built 2019
SR202L S Mntn Fwy over Van Buren St
Built 2019
Buckeye Rd Ramp B over Durango Channel
Built 2019
67TH AVE over DRAINAGE CHANNEL
Built 2009
SB 59th Ave over RID Canal
Built 2019
L202 over RID Canal
Built 1980
SR202L S Mntn Fwy over RID Cnl/Durango Rd
Built 2019
SR202L S Mntn Fwy over Roosevelt St
Built 2019
Bridge Details
- Structure #
- 20025
- Year Built
- 2018
- Length
- 42.4 m (139.1 ft)
- Max Span
- 40.8 m
- Width
- 12.7 m (41.7 ft)
- Lanes
- 2
- Daily Traffic
- 2,430
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.