Speckled Gecko Dr over Drainage Basin
Int of 98th AV+SpecG. Dr. · County 013, Arizona · Built 2015 · 2 Lanes · 720 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
33.6849, -112.2721
This bridge is in worse condition than 48% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 11 years old.
Nearby Bridges
Via Montoya Dr over Drainage Basin
Built 2015
Via Del Sol over Drainage Basin
Built 2015
Deer Valley Rd over Drainage Basin
Built 2006
Melinda Ln over Drainage Basin
Built 2007
Lake Pleasant Pkwy over Drainage Basin
Built 2005
Quail Ave over Drainage Basin
Built 2007
Harmony Ln over Drainage Basin
Built 2007
Lake Pleasant Pkwy over Drainage Basin
Built 2007
Adam Ave over Wash
Built 1999
Lake Pleasant Rd over Drainage Basin
Built 2007
Bridge Details
- Structure #
- 11487
- Year Built
- 2015
- Length
- 8.2 m (26.9 ft)
- Max Span
- 2.4 m
- Lanes
- 2
- Daily Traffic
- 720
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.