Main St over Central Canal

1.0 mi W Jct Somerton Ave · County 027, Arizona · Built 1968 · 5 Lanes · 8,071 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
11133
Year Built
1968
Reconstructed
2000
Length
16.2 m (53.1 ft)
Max Span
15.2 m
Width
24.7 m (81 ft)
Lanes
5
Daily Traffic
8,071
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.