Somerton Ave over Southeast Drain
1.0 mi S Jct Main St · County 027, Arizona · Built 1952 · 2 Lanes · 3,036 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
32.582167, -114.709917
This bridge is in worse condition than 59.5% of bridges in County 027. The average bridge in Arizona is 0 years old; this one is 74 years old.
Nearby Bridges
Co. 17th Street over Main Drain Canal
Built 2002
Main St over Central Canal
Built 1968
County 18th Street over Main Drain
Built 1995
County 19th St over Main Drain Canal
Built 2014
IRR BIA RTE 22 over YUMA EAST MAIN CANAL
Built 1972
Avenue G over Main Drain
Built 1995
S Avenue C over YCWUA East Main Canal
Built 1950
County 20th Street over Main Drain
Built 1995
Co 15th St over West Main Canal
Built 1988
IRR BIA RTE 2 over WEST MAIN CANAL
Built 1986
Bridge Details
- Structure #
- 09270
- Year Built
- 1952
- Length
- 14.6 m (47.9 ft)
- Max Span
- 5.5 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 3,036
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.