IRR BIA RTE 22 over YUMA EAST MAIN CANAL
3.2 KM SOUTH OF AZ HWY 95 · County 027, Arizona · Built 1972 · 2 Lanes · 210 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
32.569667, -114.672711
This bridge is in worse condition than 59.5% of bridges in County 027. The average bridge in Arizona is 0 years old; this one is 54 years old.
Nearby Bridges
Somerton Ave over Southeast Drain
Built 1952
S Avenue C over YCWUA East Main Canal
Built 1950
16th Street over B Main Canal
Built 1991
County 18th Street over Main Drain
Built 1995
Co. 17th Street over Main Drain Canal
Built 2002
County 19th St over Main Drain Canal
Built 2014
Main St over Central Canal
Built 1968
Avenue G over Main Drain
Built 1995
4th Ave Ext over A Canal
Built 1991
County 20th Street over Main Drain
Built 1995
Bridge Details
- Structure #
- 00000000000H037
- Year Built
- 1972
- Length
- 19.7 m (64.6 ft)
- Max Span
- 18.8 m
- Width
- 11.8 m (38.7 ft)
- Lanes
- 2
- Daily Traffic
- 210
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.