Turquoise Dr over Wash
0.02 mi S of Jct SR 69 · County 025, Arizona · Built 1990 · 2 Lanes · 884 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
34.561556, -112.376389
This bridge is in worse condition than 55.6% of bridges in County 025. The average bridge in Arizona is 0 years old; this one is 36 years old.
Nearby Bridges
Onyx Dr over Wash
Built 1995
SR 69 over Alberson Wash
Built 1953
Black Canyon Hwy over Lynx Creek
Built 2000
Stoneridge Drive over Lynx Creek
Built 2001
Prescott Lakes Pkw over Granite Creek
Built 2001
IRR BIA RTE 8 over SLAUGHTERHOUSE GULCH
Built 2010
YAVPE CONNECTOR RD over GRANITE CREEK
Built 2010
Granite Dells Rd over Granite Creek
Built 1973
Old Sr 89 over Granite Creek
Built 2011
Glassford Hill Rd over Wash
Built 1996
Bridge Details
- Structure #
- 10759
- Year Built
- 1990
- Length
- 8.2 m (26.9 ft)
- Max Span
- 3.7 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 884
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.