IRR BIA RTE 8 over SLAUGHTERHOUSE GULCH
0.6 KM E OF JUNC. HWY 89 · County 025, Arizona · Built 2010 · 4 Lanes · 4,250 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
34.560889, -112.441194
This bridge is in worse condition than 73.1% of bridges in County 025. The average bridge in Arizona is 0 years old; this one is 16 years old.
Nearby Bridges
YAVPE CONNECTOR RD over GRANITE CREEK
Built 2010
Old Sr 89 over Granite Creek
Built 2011
Old SR89 over Removed RR Tracks
Built 1956
Old SR89 over Removed RR Tracks
Built 1956
VMAC Access Rd over Government Cyn Wash
Built 2009
SR 89 over Government Draw
Built 1952
SR 69 over SR 89
Built 2009
SR 69 over Government Wash
Built 1952
Overland Rd over Government Canyon
Built 2020
Prescott Lakes Pkw over Granite Creek
Built 2001
Bridge Details
- Structure #
- 0000H68618B0240
- Year Built
- 2010
- Length
- 20.8 m (68.2 ft)
- Max Span
- 5 m
- Width
- 18.9 m (62 ft)
- Lanes
- 4
- Daily Traffic
- 4,250
- Material
- Concrete
- Design
- Culvert
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.