Prescott Lakes Pkw over Granite Creek
200 E of SR 89 · County 025, Arizona · Built 2001 · 5 Lanes · 17,865 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
34.575628, -112.430122
This bridge is in worse condition than 55.6% of bridges in County 025. The average bridge in Arizona is 0 years old; this one is 25 years old.
Nearby Bridges
YAVPE CONNECTOR RD over GRANITE CREEK
Built 2010
IRR BIA RTE 8 over SLAUGHTERHOUSE GULCH
Built 2010
Old Sr 89 over Granite Creek
Built 2011
Old SR89 over Removed RR Tracks
Built 1956
Old SR89 over Removed RR Tracks
Built 1956
VMAC Access Rd over Government Cyn Wash
Built 2009
SR 89 over Government Draw
Built 1952
SR 69 over SR 89
Built 2009
Granite Dells Rd over Granite Creek
Built 1973
SR 69 over Government Wash
Built 1952
Bridge Details
- Structure #
- 10235
- Year Built
- 2001
- Length
- 191.4 m (628 ft)
- Max Span
- 38.1 m
- Width
- 26.2 m (86 ft)
- Lanes
- 5
- Daily Traffic
- 17,865
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.