Palo Verde On-Ramp over Tucson Diversion Channel

at Palo Verde Rd · County 019, Arizona · Built 2012 · 3 Lanes · 6,000 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
10502
Year Built
2012
Length
23.8 m (78.1 ft)
Max Span
23.8 m
Width
19.2 m (63 ft)
Lanes
3
Daily Traffic
6,000
Material
Concrete
Design
Arch - Deck
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.