Palo Verde Rd over UPRR/36th St
Palo Verde Rd at UPRR · County 019, Arizona · Built 2012 · 4 Lanes · 35,597 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.190561, -110.915889
This bridge is in worse condition than 80.8% of bridges in County 019. The average bridge in Arizona is 0 years old; this one is 14 years old.
Nearby Bridges
Aviation HWY over Diversion Channel
Built 1984
36th Street over Diversion Channel
Built 1963
Palo Verde On-Ramp over Tucson Diversion Channel
Built 2012
37th Street Ramp over Tucson Diversion Channel
Built 2012
Palo Verde Road over Tucson Diversion Channel
Built 2012
Palo Verde Road over Small Wash
Built 2011
Alvernon Way over Aviation Hwy
Built 1984
SB Alvernon over PV Road/Diversion Chnl
Built 1984
Alvernon Way over 34-36 Connection
Built 1984
North Alvernon Way over Diversion Channel
Built 1984
Bridge Details
- Structure #
- 10501
- Year Built
- 2012
- Length
- 106.7 m (350.1 ft)
- Max Span
- 23.5 m
- Width
- 40.5 m (132.9 ft)
- Lanes
- 4
- Daily Traffic
- 35,597
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.