36th Street over Diversion Channel

Overpass @ Palo Verde · County 019, Arizona · Built 1963 · 4 Lanes · 8,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
09252
Year Built
1963
Length
14.3 m (46.9 ft)
Max Span
13.7 m
Width
19.5 m (64 ft)
Lanes
4
Daily Traffic
8,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.