40th Street over Western Canal

0.33 mi N of Baseline Rd · County 013, Arizona · Built 1987 · 4 Lanes · 14,525 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
09958
Year Built
1987
Length
14.3 m (46.9 ft)
Max Span
14 m
Width
24.4 m (80.1 ft)
Lanes
4
Daily Traffic
14,525
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.