Ramp WB C-D over Baseline Road

0.7 mi S Jct US 60 · County 013, Arizona · Built 1995 · 2 Lanes · 14,989 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
02348
Year Built
1995
Length
46.3 m (151.9 ft)
Max Span
44.8 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
14,989
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.