I 10 over Baseline Road

0.7 mi S Jct US 60 · County 013, Arizona · Built 1994 · 9 Lanes · 191,894 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
02349
Year Built
1994
Length
46.3 m (151.9 ft)
Max Span
44.8 m
Width
58.7 m (192.6 ft)
Lanes
9
Daily Traffic
191,894
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.