Alvernon Way over Alvernon Way NB Ramp

0.6 mi N Jct Ajo Way · County 019, Arizona · Built 1984 · 6 Lanes · 66,902 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
09811
Year Built
1984
Length
44.2 m (145 ft)
Max Span
22.9 m
Width
31.5 m (103.3 ft)
Lanes
6
Daily Traffic
66,902
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.