3rd Street over Yuma East Main Canal

0.5 mi W Jct 4th Ave · County 027, Arizona · Built 1935 · 3 Lanes · 8,023 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
09489
Year Built
1935
Reconstructed
1957
Length
20.1 m (65.9 ft)
Max Span
6.4 m
Width
15.7 m (51.5 ft)
Lanes
3
Daily Traffic
8,023
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$11,000
Total Project Cost
$13,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.