1st Street over East Main Canal

0.5 mi W Jct 4th Ave · County 027, Arizona · Built 1935 · 5 Lanes · 11,708 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
09337
Year Built
1935
Reconstructed
1959
Length
37.2 m (122 ft)
Max Span
7.9 m
Width
23.1 m (75.8 ft)
Lanes
5
Daily Traffic
11,708
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.