SB 8 over Yuma Canal

0.3 mi S Jct I-8 · County 027, Arizona · Built 1956 · 5 Lanes · 18,738 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
00487
Year Built
1956
Reconstructed
1994
Length
44.5 m (146 ft)
Max Span
21.3 m
Width
26.7 m (87.6 ft)
Lanes
5
Daily Traffic
18,738
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.