WINTERHAVEN DRIVE over CALIFORNIA WASTEWAY
120 FT N/O OF I-8 RAMPS · County 025, California · Built 1955 · 3 Lanes · 6,010 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
32.732939, -114.624783
This bridge is in worse condition than 92.6% of bridges in County 025. The average bridge in California is 0 years old; this one is 71 years old.
Nearby Bridges
INTERSTATE 8 EB over CALIFORNIA WASTEWAY
Built 1973
WINTERHAVEN DR over COLORADO RIVER
Built 1956
INTERSTATE 8 WB over CALIFORNIA WASTEWAY
Built 1973
WINTERHAVEN DRIVE over INTERSTATE 8
Built 1973
PICACHO RD over YUMA MAIN CANAL
Built 1925
SB 8 over Colorado River
Built 1956
PICACHO RD over RESERVATION MAIN DRAIN
Built 1977
I 8 WB over Colo R Pentntry Av SPTCO
Built 1978
I 8 EB over Colo R Pentntry Av SPTCO
Built 1978
SB 8 over Yuma Canal
Built 1956
Bridge Details
- Structure #
- 58C0094
- Year Built
- 1955
- Reconstructed
- 1973
- Length
- 64.6 m (211.9 ft)
- Max Span
- 15.8 m
- Width
- 23 m (75.5 ft)
- Lanes
- 3
- Daily Traffic
- 6,010
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.